Almost every project today has cost or schedule overruns, and project failures are practically the norm. 现在几乎每个项目都在成本或者日程上超出预算,项目失败已经成为常规。
Project management: Cost, schedule, risk, staffing, and so forth. 项目管理:成本、时间表、风险、人员分配等等。
The challenge of accurately estimating cost and schedule is certainly part of the problem. 精确评估成本和日程的挑战已经成为主要的问题。
It also helps us determine how to do this within a set of business-critical constraints ( cost, schedule, testing parameters, ease of manufacturing, and so on). 它也帮助我们确定如何在一组重要商业约束(成本,进度,测试参数,易于生产,等等)中进行工作。
Fundamentally, the initial cost and schedule estimates are frequently way off. 从根本上说,最初的对成本和工期的评估往往都会失效。
An integrated software development platform and consistent, configurable processes and best practices are essential to mitigate risk to cost and schedule across these large projects. 一个集成的软件开发平台和一致的,结构化的过程以及良好的实践对减小风险和成本,确定大型项目的时间进度都是至关重要的。
Agile COCOMO is a method and accompanying tool that are geared for lightweight incremental cost and schedule estimation. 敏捷COCOMO是一种用于轻量级的增量的成本和日程评估的工具。
Moreover, you can leverage the invaluable engineering information captured in the DoDAF products to reduce risk to cost and schedule during systems development. 此外,您可以利用在DoDAF产品中获得的非常宝贵的工程信息来减少系统开发中成本和进度安排的风险。
For example, an insurance company recently was experiencing unacceptable cost and schedule overruns. 举例来说,一家保险公司最近经历了不可接受的成本和进度的超出。
Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM. 质量活动必须使成本和进度处于项目的控制之下,以满足CMM的精神。
What is your average cost/ schedule overrun? 您的平均成本或进度超出是什么?
Anything else decreases productivity and increases the cost and schedule. 任何其他的情况都可能降低效率和增加成本、延长计划。
Most software projects can be considered at least partial failures, in the sense that few projects meet all their cost, schedule, quality, and requirements objectives. 很少项目能达到所有的成本、进度、质量和需求的目标,在这种意义上,大多数软件被认为至少是局部故障的。
Most Agile teams vary the scope and keep a tab on Cost, Schedule and Quality. 很多敏捷团队会变更范围,并监控成本、日程和质量。
Research on Applying the Earned Value Method in the Cost and Schedule Control of Equipment Acquisition 挣值法在装备采办成本和进度控制中的应用研究
A general statement that there are cost and schedule implications shall not be admissible at any time. 在任何时候,一份暗示具有成本和进度影响的笼统描述都不会被采纳。
Software cost and schedule estimating is not a simple calculation. 软件成本和时间估计不是简单的计算。
Process, people, and technology are the major determinants of product cost, schedule, and quality. 过程、人和技术是产品开发成本、进度和质量的主要决定因素。
The final Elaboration phase deliverable is a plan ( including cost and schedule estimates) for the Construction phase. 最后制定阶段成果是一个计划(包括成本和进度的估计数)的施工阶段。
Integrated cost/ schedule control using the earned value technique. 综合成本/进度控制与挣增值技术。
Earned Value is the most important measurement in the project cost and schedule control. 获得值是项目费用控制和项目进度控制的重要度量指标。
Create the work breakdown structure with the team to develop the cost, schedule, resource, quality and procurement plans. 和团队一起建立工作分解结构,并开发成本、进度、资源、质量和采购计划。
Give cost and time data for project tasks, the Six Sigma Black Belt should be able to compute the cost of normal and crash schedules and the minimum total cost schedule. 给出项目任务的成本和时间数据,6西格玛黑带应能计算出正常的和紧急加快的生产费用表以及最小的生产总费用表。
The deputy director-civils will work closely with the project control team to provide accurate reporting of the status and progress, ensuring control of cost and schedule. 土建工程副总监将与项目控制团队密切合作,提供状态和进展的准确报告,确保成本和进度控制。
Predictability: In custom software development, predictability of cost and schedule is important to the customer. 可预见性:在客户软件开发中,开支和进度的可预见性对客户来说很重要。
Project objectives can also include cost, schedule, and quality targets. 项目目标可能还包括费用、进度和质量指标。
Projects may have a wide variety of business, cost, schedule, technical, and quality objectives. 项目可能有各种各样的运营方式、费用、进度、技术和质量目标。
This paper introduces in more detail the whole process of this project from the aspects of cost schedule quality control, work commentary and the relations with client. 文章着重从费用、进度和质量控制,工作评述,与业主关系方面对项目全过程进行了较详细的介绍。
Management information system for cost schedule integration control for nuclear power projects 核电工程投资与进度集成控制管理信息系统
Based on the project management experience abroad and at home, a cost schedule integration control model was developed to improve nuclear power project management. 为满足中国核电建设工程投资控制和进度控制管理需要,在国内外核电工程管理经验的基础上,提出了核电工程投资与进度集成控制管理系统的模型。